Skip to content

End-to-End tests

End-to-End tests #695

Triggered via schedule October 24, 2024 04:04
Status Failure
Total duration 6h 9m 15s
Billable time 6h 12m
Artifacts 1

end-to-end.yml

on: schedule
Build End to End Tests
7m 25s
Build End to End Tests
Matrix: End to end Tests
Notify on failure
4s
Notify on failure
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 1 warning
End to end Tests (release)
The job running on runner GitHub Actions 135 has exceeded the maximum execution time of 90 minutes.
End to end Tests (release)
The operation was canceled.
End to end Tests (privacy)
The job running on runner GitHub Actions 468 has exceeded the maximum execution time of 90 minutes.
End to end Tests (privacy)
The operation was canceled.
End to end Tests (securityTest)
The job running on runner GitHub Actions 84 has exceeded the maximum execution time of 90 minutes.
End to end Tests (securityTest)
The operation was canceled.
End to end Tests (adClick)
The job running on runner GitHub Actions 117 has exceeded the maximum execution time of 90 minutes.
End to end Tests (adClick)
The operation was canceled.
Build End to End Tests
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3, actions/cache@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/

Artifacts

Produced during runtime
Name Size
duckduckgo-ios-app
85.8 MB