Skip to content

Merge pull request #67 from julffers/develop #290

Merge pull request #67 from julffers/develop

Merge pull request #67 from julffers/develop #290

Triggered via push November 19, 2024 15:30
Status Failure
Total duration 1m 37s
Artifacts
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 4.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
The operation was canceled.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
The operation was canceled.