-
Notifications
You must be signed in to change notification settings - Fork 17
Open
Milestone
Description
What
Not started:
- 8-11.4.3
- 8-11.4.4.2
- 8-11.4.5.1
- 8-11.4.5.2
- 8-11.4.5.3
- 8-11.4.5.4
- 8-11.4.6.1 (what is missing?)
- 8-11.4.6.2 (missing examples)
- 8-11.4.9.1
- 8-11.4.9.2
Action_3: The tool evaluation is still in progress. Some tools are hosted within the Eclipse foundation (https://www.eclipse.org/).
Action_9: Requirements related to tools need to be audited.
Action_63: To be able to judge the completeness of the tool requirements a functional description of the used tool features is required.
Action_83: The process shall require that the user verifies the correct version and usage of specific tools.
How
No response
Estimates for realization
This requires the complete tool evaluation to be done. Depends on still to be determined tool list.
3 man months
Category
- Affects Detailed Design
Requirements / Architecture
- Requirements / Architecture are not affected by this change?
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
No labels
Type
Projects
Status
Backlog
Status
No status