Skip to content

Morango Integration Tests #8

Morango Integration Tests

Morango Integration Tests #8

Triggered via schedule December 29, 2024 01:12
Status Failure
Total duration 1m 20s
Artifacts
Path match check
3s
Path match check
Morango Integration Tests with PostgreSQL
1m 2s
Morango Integration Tests with PostgreSQL
Matrix: Morango Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

14 errors and 2 warnings
Morango Integration Tests (3.12)
Process completed with exit code 1.
Morango Integration Tests (3.7)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.7)
Process completed with exit code 1.
Morango Integration Tests (3.6)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.6)
The operation was canceled.
Morango Integration Tests (3.8)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.8)
The operation was canceled.
Morango Integration Tests (3.9)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.9)
The operation was canceled.
Morango Integration Tests (3.11)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.11)
The operation was canceled.
Morango Integration Tests (3.10)
The job was canceled because "_3_12" failed.
Morango Integration Tests (3.10)
The operation was canceled.
Morango Integration Tests with PostgreSQL
Process completed with exit code 1.
Path match check
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Morango Integration Tests with PostgreSQL
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636