Skip to content

Hack to support two volumes per DN in upgrade cluster #2561

Hack to support two volumes per DN in upgrade cluster

Hack to support two volumes per DN in upgrade cluster #2561

Triggered via push December 6, 2024 18:06
Status Failure
Total duration 30m 45s
Artifacts 10

post-commit.yml

on: push
CI  /  build-info
9s
CI / build-info
Matrix: CI / basic
Matrix: CI / build
Matrix: CI / integration
Matrix: CI / acceptance
CI  /  kubernetes
0s
CI / kubernetes
Matrix: CI / compile
Fit to window
Zoom out
Zoom in

Annotations

4 errors
CI / basic (checkstyle)
Process completed with exit code 1.
CI / basic (checkstyle)
Process completed with exit code 1.
CI / basic (docs)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 30 minutes.
CI / basic (docs)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
author
250 Bytes
bats
1.06 KB
checkstyle
3.71 KB
dependency
3.91 KB
findbugs
184 KB
license
1.71 KB
ozone-bin Expired
414 MB
ozone-repo Expired
305 MB
ozone-src Expired
14 MB
rat
250 Bytes