Hack to support two volumes per DN in upgrade cluster #2561
post-commit.yml
on: push
CI
/
build-info
9s
Matrix: CI / basic
Matrix: CI / build
Matrix: CI / integration
Matrix: CI / acceptance
CI
/
kubernetes
0s
Matrix: CI / compile
CI
/
coverage
0s
Annotations
4 errors
CI / basic (checkstyle)
Process completed with exit code 1.
|
CI / basic (checkstyle)
Process completed with exit code 1.
|
CI / basic (docs)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 30 minutes.
|
CI / basic (docs)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
author
|
250 Bytes |
|
bats
|
1.06 KB |
|
checkstyle
|
3.71 KB |
|
dependency
|
3.91 KB |
|
findbugs
|
184 KB |
|
license
|
1.71 KB |
|
ozone-bin
Expired
|
414 MB |
|
ozone-repo
Expired
|
305 MB |
|
ozone-src
Expired
|
14 MB |
|
rat
|
250 Bytes |
|