Fetch CLI decision flow improvement(#1299) #111
tests_and_cleanup.yml
on: pull_request
run-pytest
3m 22s
test-colab-notebook
4m 0s
update-model-request_template
6s
Matrix: install-ersilia
Matrix: test-docker
Matrix: test-os
Annotations
13 errors
test-docker (3.7)
Process completed with exit code 1.
|
test-docker (3.8)
The job was canceled because "_3_7" failed.
|
test-docker (3.8)
The operation was canceled.
|
test-docker (3.11)
The job was canceled because "_3_7" failed.
|
test-docker (3.11)
The operation was canceled.
|
test-docker (3.10)
The job was canceled because "_3_7" failed.
|
test-docker (3.10)
The operation was canceled.
|
test-docker (3.9)
The job was canceled because "_3_7" failed.
|
test-docker (3.9)
The operation was canceled.
|
install-ersilia (3.7)
Process completed with exit code 1.
|
install-ersilia (3.9)
The job was canceled because "_3_7" failed.
|
install-ersilia (3.9)
The operation was canceled.
|
run-pytest
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
output-cli.ipynb
Expired
|
5.04 KB |
|