Skip to content

Commit

Permalink
Update ecip-1109.md (#519)
Browse files Browse the repository at this point in the history
Following ECIP-1000 procedure:
Change the status of ECIP-1109 to `Last Call` after the developers call yesterday where a mainnet block was selected/agreed upon. Note: there was no observed opposition/criticism to this proposal or the timeline of activation.
https://www.youtube.com/watch?v=psEzr2SmUpo

I propose this ECIP sits in Last Call until Dec 31 (~3 weeks) for a review period. The core-geth client should be released in this timeframe.

Should everything be functioning properly, then move to `Accepted` status if there is no reason to revert to `Draft`, like discovery of error/bug in working client or something of the sort.

I'm open to adjusting any dates laid out here. These are simply an initial workflow suggestion in an effort to document and follow the status change track laid out in ECIP-1000.
  • Loading branch information
gitr0n1n authored Dec 7, 2023
1 parent 4b46240 commit daf8963
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion _specs/ecip-1109.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,7 +2,7 @@
lang: en
ecip: 1109
title: Spiral EVM and Protocol Upgrades
status: Draft
status: Last Call
type: Meta
author: Christos Ziogas <chris@etccooperative.org>, Diego López León <diego@etccooperative.org>, Isaac Ardis <isaac@etccooperative.org>
created: 2023-05-10
Expand Down

0 comments on commit daf8963

Please sign in to comment.