Skip to content

Merge pull request #2 from ewdlop/ewdlop-patch-1 #18

Merge pull request #2 from ewdlop/ewdlop-patch-1

Merge pull request #2 from ewdlop/ewdlop-patch-1 #18

Triggered via push December 31, 2024 21:14
Status Failure
Total duration 6h 0m 21s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (3.10)
The job running on runner GitHub Actions 23 has exceeded the maximum execution time of 360 minutes.
build (3.10)
The operation was canceled.
build (3.8)
The job running on runner GitHub Actions 40 has exceeded the maximum execution time of 360 minutes.
build (3.8)
The operation was canceled.
build (3.9)
The job running on runner GitHub Actions 25 has exceeded the maximum execution time of 360 minutes.
build (3.9)
The operation was canceled.