chore(upgrade): v1.11.0 to v1.13.0 #5963
Triggered via pull request
August 20, 2024 15:06
Status
Cancelled
Total duration
20m 33s
Artifacts
–
verify-pr-commit.yml
on: pull_request
Determine Changed Files
6s
Clear Metadata Labels
1s
Matrix: build-binaries
Check for Vulnerable Crates
5m 34s
Verify Rust Code Format
1m 13s
Lint Rust Code
12m 8s
Verify Rust Developer Docs
12m 19s
Verify Rust Packages and Dependencies
10m 47s
Run Rust Tests
19m 13s
Calculate Code Coverage
14m 54s
Matrix: build-binaries-dummy
Matrix: verify-build-runtimes-dummy
Matrix: verify-build-runtimes
Verify Node Docker Images
0s
Execute Binary Checks
0s
Check Metadata and Spec Version
0s
Verify Genesis State
0s
Run E2E Tests
0s
Annotations
11 errors and 1 warning
Build local Binary on pr Branch
Process completed with exit code 101.
|
Build dev Binary on pr Branch
The job was canceled because "local_chore_upgrade-polka" failed.
|
Build dev Binary on pr Branch
The operation was canceled.
|
Build testnet Binary on pr Branch
The job was canceled because "local_chore_upgrade-polka" failed.
|
Build testnet Binary on pr Branch
The operation was canceled.
|
Build local Binary on main Branch
The job was canceled because "local_chore_upgrade-polka" failed.
|
Build local Binary on main Branch
The operation was canceled.
|
Build mainnet Binary on pr Branch
The job was canceled because "local_chore_upgrade-polka" failed.
|
Build mainnet Binary on pr Branch
The operation was canceled.
|
Run Rust Tests
Canceling since a higher priority waiting request for 'Verify PR Commit-refs/pull/2132/merge' exists
|
Run Rust Tests
The operation was canceled.
|
Build local Binary on pr Branch
This job failure may be caused by using an out of date self-hosted runner. You are currently using runner version 2.319.0. Please update to the latest version 2.319.1
|