Changes #23
testnet.yml
on: pull_request
Compute Branch Sha
0s
Build Testnet
/
Documentation
1m 16s
Build Testnet
/
Rewards Dashboard
36s
Build Testnet
/
Advance Tools
1m 27s
Build Testnet
/
Redirects
18s
Build Testnet
/
USDC Bridge
0s
Build Testnet
/
Token Bridge
0s
Deploy Testnet
0s
Annotations
4 errors
Build Testnet / Advance Tools
Canceling since a higher priority waiting request for 'refs/pull/3/merge-testnet-advanced-tools' exists
|
Build Testnet / Advance Tools
The operation was canceled.
|
Build Testnet / Wormhole Connect
Canceling since a higher priority waiting request for 'refs/pull/3/merge-testnet-wormhole-connect' exists
|
Build Testnet / Wormhole Connect
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
build-docs
Expired
|
71.1 MB |
|
build-redirects
Expired
|
2.29 KB |
|
build-rewards-dashboard
Expired
|
2.43 MB |
|