Skip to content

Update deps

Update deps #29

Triggered via pull request March 17, 2024 21:18
@avakarevavakarev
synchronize #218
update-deps
Status Failure
Total duration 2m 31s
Artifacts

integration-test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (1.18)
golangci-lint exit with code 5
test (1.21)
The job was canceled because "_1_18" failed.
test (1.21)
golangci-lint exit with code 5
test (1.22)
The job was canceled because "_1_18" failed.
test (1.22)
golangci-lint exit with code 5
test (1.20)
The job was canceled because "_1_18" failed.
test (1.20)
golangci-lint exit with code 5
test (1.19)
The job was canceled because "_1_18" failed.
test (1.19)
golangci-lint exit with code 5