[DRAFT] feat: add generated sync client #1252
Triggered via pull request
September 13, 2024 00:04
Status
Failure
Total duration
1m 17s
Artifacts
–
Annotations
11 errors
unit (3.11)
Process completed with exit code 1.
|
unit (3.8)
The job was canceled because "_3_11" failed.
|
unit (3.8)
The operation was canceled.
|
unit (3.7)
The job was canceled because "_3_11" failed.
|
unit (3.7)
The operation was canceled.
|
unit (3.9)
The job was canceled because "_3_11" failed.
|
unit (3.9)
The operation was canceled.
|
unit (3.10)
The job was canceled because "_3_11" failed.
|
unit (3.10)
The operation was canceled.
|
unit (3.12)
The job was canceled because "_3_11" failed.
|
unit (3.12)
The operation was canceled.
|