Skip to content

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #147

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #147

Status Failure
Total duration 41s
Artifacts

go.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 4 warnings
Test on go 1.19
Docker build failed with exit code 1
Test on go 1.18
The job was canceled because "_1_19" failed.
Test on go 1.18
The operation was canceled.
Test on go 1.19
Docker build failed with exit code 1, back off 5.086 seconds before retry.
Test on go 1.19
Docker build failed with exit code 1, back off 7.198 seconds before retry.
Test on go 1.18
Docker build failed with exit code 1, back off 4.461 seconds before retry.
Test on go 1.18
Docker build failed with exit code 1, back off 9.172 seconds before retry.