Fix VariableArrivalRate not working well #1285
Fix VariableArrivalRate not working well #1285
Conversation
052120d
to
eb65fed
Compare
Codecov Report
@@ Coverage Diff @@
## new-schedulers #1285 +/- ##
==================================================
- Coverage 76.41% 76.36% -0.06%
==================================================
Files 162 162
Lines 12838 12809 -29
==================================================
- Hits 9810 9781 -29
Misses 2511 2511
Partials 517 517
Continue to review full report at Codecov.
|
a recording showing an extreme case |
eb65fed
to
9b59904
Compare
cf6d82a
to
32ec8ce
Compare
9fa61d9
to
005b855
Compare
The previous implementation worked basically as follows: A list of changes to the arrival rate is generated where there is a minimum time between this changes (currently 250ms). This means that for any ramp-up/down there is a step every 250ms (more or less). After this is generated a goroutine will read that list and send the change on a channel at the appropriate time. During ramp-up/down this is every 250ms (more or less). Another goroutine will be receiving those changes and resetting a timer to the new value. And here is where the problem lies: If the arrival rate is more then 1 iteration each 250ms this means that it will never trigger a start of a VU. The extreme example is having ramp-up to 4 iteration per second - this is exactly 1 iteration each 250ms, which means that for the whole duration up to end of the ramp up there will be zero iterations started. In order to completely remove this I went the step further. The way we seperate the interval in small pieces reminded me of integrals and is one of the very easy cases for using integrals. So I just calculate the integral of the function that is the number of VUs over time. The answer is how many ioterations need to be done there, so if I reverse this and instead calculate for how much time I will get 1 I get when the first iteration should start. I can do that for any iteration number and if there is no result then obviously we can get that :D. This also has the awesome sideeffect that if we split the executib in 10 we only need to calculate 1/10th of the integrals on each instance.
32ec8ce
to
56f03c7
Compare
var ch = make(chan time.Duration, 10) // buffer 10 iteration times ahead | ||
var prevTime time.Duration | ||
go varr.config.cal(varr.executionState.ExecutionTuple, ch) |
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
This seems like an excellent thing to put in the Init()
method. The only problem that I can see is that this goroutine is going to leak. Not a big deal, but still not really great, given that test runs can have multiple executors, some of which working only at the start
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
I would prefer to leave it for when I rewrite the calculation as a state machine - maybe then it will be a bigger problem.
I don't think this takes enough time to warrant be moved and adding ch
as a field to the executor's struct.
Do you mean that it leaks until it finishes ? is needed? because - yes that it does. But it will end when it goes through all the stages and emits all the iterations needed
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
LGTM. There are some minor nitpicks I've left as inline comments, and I'll repeat the VU allocation comment in the issue.
for _, stage := range varc.Stages { | ||
to = float64(stage.Target.ValueOrZero()) / float64(timeUnit) | ||
dur = float64(time.Duration(stage.Duration.Duration).Nanoseconds()) | ||
if from != to { // ramp up/down |
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
It's probably not a big deal, but given that from
and to
are float64
s, this comparison probably should be done with math.Abs(from-to) < tolerance
and some fairly large epsilon/tolerance value.
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
In some of the earlier iterations, I was using directly the stage.Target int value but then I released that both from
and to
are always just stage.Target / timeUnit where one of them is a constant for the whole calculation and stage.Target is the only moving part ... I highly doubt that there is a way for this to not be equal... also timeUnit is, in general, some number such as 1000000000(1 second in nanoseconds) so if we are going from 1iterations/s to 2 iterations/s the difference will be something very small so the epsilon should also be something very small ...
Again I highly doubt that golang does anything that can make this math wrong ...
p.s. thinking about this I can probably move the timeUnit outside of the calculations .. somehow ... should try it when I finish with my code reviews ....
varr.logger.Warningf("Insufficient VUs, reached %d active VUs and cannot allocate more", maxVUs) | ||
continue | ||
} | ||
vu, err = varr.executionState.GetUnplannedVU(maxDurationCtx, varr.logger) |
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
I realized this (and my original) implementation of initializing unplanned VUs in the middle of the iteration loop is very wrong... This synchronous operation can significantly derail the actual iteration pace... Another reason to implement the first part of #1386, or just allocation of the VU in a goroutine. But then again, if a few iterations in a row lack a VU to run on, we probably shouldn't allocate more than 1 VU concurrently...
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
LGTM. I like that the VAR implementation is conceptually simpler now, though I can't comment much on the math and trust you guys (and the passing tests) that it's working properly now. Hats off :)
The previous implementation worked basically as follows:
A list of changes to the arrival rate is generated where there is a
minimum time between this changes (currently 250ms). This means that for
any ramp-up/down there is a step every 250ms (more or less).
After this is generated a goroutine will read that list and send the
change on a channel at the appropriate time. During ramp-up/down this is
every 250ms (more or less).
Another goroutine will be receiving those changes and resetting a timer
to the new value. And here is where the problem lies:
If the arrival rate is more then 1 iteration each 250ms this means that
it will never trigger a start of a VU.
The extreme example is having ramp-up to 4 iteration per second - this
is exactly 1 iteration each 250ms, which means that for the whole
duration up to end of the ramp up there will be zero iterations started.
In order to completely remove this I went the step further. The way we
seperate the interval in small pieces reminded me of integrals and
is one of the very easy cases for using integrals.
So I just calculate the integral of the function that is the number of
VUs over time. The answer is how many ioterations need to be done there,
so if I reverse this and instead calculate for how much time I will get
1 I get when the first iteration should start. I can do that for any
iteration number and if there is no result then obviously we can get
that :D.
This also has the awesome sideeffect that if we split the executib in 10
we only need to calculate 1/10th of the integrals on each instance.