Skip to content

breakout min/core tests #69

breakout min/core tests

breakout min/core tests #69

Triggered via push January 2, 2024 06:29
Status Failure
Total duration 8m 16s
Artifacts

ci.yml

on: push
Matrix: test-minimal-python
test-build
44s
test-build
Matrix: test-core-python
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test-core-python (3.11)
Process completed with exit code 5.
test-core-python (3.8)
The job was canceled because "_3_11" failed.
test-core-python (3.8)
The operation was canceled.
test-core-python (3.10)
The job was canceled because "_3_11" failed.
test-core-python (3.10)
The operation was canceled.
test-core-python (3.9)
The job was canceled because "_3_11" failed.
test-core-python (3.9)
The operation was canceled.