Skip to content

PR #7

PR #7 #12

Triggered via dynamic July 9, 2024 13:10
Status Success
Total duration 8m 1s
Artifacts

codeql

on: dynamic
Matrix: analyze
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Analyze (go)
not enough arguments in call to NewL2Verifier
Analyze (go)
not enough arguments in call to derive.NewEngineController
Analyze (go)
expectedCall redeclared in this block
Analyze (go)
other declaration of expectedCall
Analyze (go)
AbiBasedRpc redeclared in this block
Analyze (go)
other declaration of AbiBasedRpc
Analyze (go)
NewAbiBasedRpc redeclared in this block
Analyze (go)
other declaration of NewAbiBasedRpc
Analyze (go)
method expectedCall.String already declared at /home/runner/work/optimism/optimism/op-service/sources/batching/test/abi_stub.go:82:24
Analyze (go)
method AbiBasedRpc.AddContract already declared at /home/runner/work/optimism/optimism/op-service/sources/batching/test/abi_stub.go:102:23