Skip to content

Commit

Permalink
Update source/gent/tier1_hortense.rst
Browse files Browse the repository at this point in the history
Co-authored-by: Andy Georges <itkovian@gmail.com>
  • Loading branch information
epauwels and itkovian authored Jan 13, 2025
1 parent 8c904db commit 508904d
Showing 1 changed file with 1 addition and 1 deletion.
2 changes: 1 addition & 1 deletion source/gent/tier1_hortense.rst
Original file line number Diff line number Diff line change
Expand Up @@ -22,7 +22,7 @@ and maintained and supported by the HPC-UGent team.
In 2023 a second phase was added, more than doubling the existing capacity of the system.

End of 2025, the decommissioning process of cluster Hortense will start (see LINK HERE).
This is in anticipation of the 4th VSC Tier-1 cluster that will become available at the VUB datacenter.
This is in anticipation of the 4th VSC Tier-1 cluster that will become available at the VUB datacenter from date_ XXX.