Skip to content

Track renames in pymbolic 2024.2 #3223

Track renames in pymbolic 2024.2

Track renames in pymbolic 2024.2 #3223

Triggered via push November 22, 2024 19:46
Status Failure
Total duration 45m 15s
Artifacts

ci.yml

on: push
Matrix: downstream_tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 2 warnings
Ruff
Process completed with exit code 1.
Tests for downstream project meshmode
The hosted runner: GitHub Actions 31 lost communication with the server. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
Tests for downstream project mirgecom
No point in testing mirgecom at the moment, see https://github.com/illinois-ceesd/mirgecom/pull/898. Test not performed.
Ruff
The `python-version` input is not set. The version of Python currently in `PATH` will be used.