Skip to content

Commit

Permalink
add colons
Browse files Browse the repository at this point in the history
  • Loading branch information
KatherineCox authored Apr 7, 2023
1 parent 1dbe88a commit 5383e7a
Showing 1 changed file with 4 additions and 4 deletions.
8 changes: 4 additions & 4 deletions 01-instructor_guide.Rmd
Original file line number Diff line number Diff line change
Expand Up @@ -53,26 +53,26 @@ Here is a [checklist](https://docs.google.com/document/d/1-HqQqH_qlkHwRua8-b92My

Here is a suggested timeframe for working through the checklist:

**1+ month before**
**1+ month before:**

- Figure out how you will fund the class/workshop
- Start working through INSTRUCTOR SETUP.
- It's a good idea to get billing figured out with plenty of time to spare
- Take some time to familiarize yourself with the content and make any desired updates or customizations.
- Do any necessary EVENT SETUP steps

**~1 week before**
**~1 week before:**

- Start working through RUNNING THE CLASS
- If possible, have students log in to AnVIL and send you their usernames, so you can add them to the Student Group ahead of time. This saves time on the day of the class.
- **Do not add students to your Billing Project** ahead of time. This prevents them from accruing costs.

**Day of (or shortly before)**
**Day of (or shortly before):**

- Add students to Billing Project
- Have students clone the Workspace (They cannot do this until you have added them to the Billing Project. As soon as they do this, they can start computing.)

**After**
**After:**

- Collect feedback, if you didn't do it during the class/workshop
- Work though EVENT WRAP-UP - until you shut things down, you will continue to accrue costs

0 comments on commit 5383e7a

Please sign in to comment.