Skip to content

2025 01 20_meeting

Michael Wetter edited this page Jan 22, 2025 · 2 revisions

SOEP Coordination meeting

Date: January 20, 2025, 8:15am-9am Pacific Times

The purpose of this meeting is to coordinate the Modelica integration for SOEP.

Meeting information

Join from PC, Mac, Linux, iOS or Android: https://lbnl.zoom.us/my/mwetter

Or iPhone one-tap (US Toll): +14086380968,6614042296# or +16465588656,6614042296#

Or Telephone:
Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll) Meeting ID: 661 404 2296 International numbers available: https://lbnl.zoom.us/zoomconference?m=_h5BuJ686mPy3rWEyKf4NROxLaeOV5J8

Agenda

  1. Previous action items
  2. AOP alignment
  3. OpenStudio integration
  4. Modelon
  5. Compiler integration
  6. Stuart: FMI-QSS
  7. Modelica Buildings Library
  8. Kyle, Michael: EnergyPlus-Modelica coupling.
  9. Other items

Participants

Kyle Benne
Sen Huang
Jianjun Hu
Michael Wetter

Minutes

AOP alignment

LBNL: 3/30/25, Released Modelica Buildings Library with template for combined chiller and heat pump plants with storage and heat recovery chiller, and with updated EnergyPlus v 24.2 coupling.
LBNL: 4/30/25, Modelica Buildings Library ready for first OpenStudio workflow from Spawn that includes an auto-sized HVAC system.

Sizing

Draft specification at https://lbl-srg.github.io/soep/softwareArchitecture.html.

Next time, see if DesignSpecification:OutdoorAir:SpaceList should cause the idf to be rejected.

Sequence

  1. Done: 24.2.0 without auto-sizing (watch changes to CMake list). Make this a priority.
  2. 24.2.0 with auto-sizing.

OpenStudio integration

No discussion.

Modelon

No discussion.

Compiler integration

No discussion.

FMI-QSS

No discussion.

Modelica Buildings Library

Backlog on fixing various issue.

PNNL priority is zone side templates.

PNNL has milestones for end of FY to implement heat pump water heater, mostly using existing classes. PNNL to make verification of heat pump water heater. PNNL to have internal review next week.

ORNL has dehumidifier as deliverable end of October, https://github.com/lbl-srg/modelica-buildings/pull/3475

Dehumidifer depends on thermal wheel, https://github.com/lbl-srg/modelica-buildings/pull/3554

ORNL works on autotuning PID, waiting for Jianjun's comment, https://github.com/lbl-srg/modelica-buildings/pull/2957

Work on air filter model is ongoing (to support multiple contaminants), https://github.com/lbl-srg/modelica-buildings/pull/3676

EnergyPlus-Modelica coupling

Spawn related PR at https://github.com/lbl-srg/modelica-buildings/projects/2

Issues are at https://github.com/lbl-srg/modelica-buildings/issues?q=is%3Aissue+is%3Aopen+label%3Aspawn

Next, work on https://github.com/lbl-srg/modelica-buildings/projects/2

OS compatibility matrix is at https://github.com/NREL/OpenStudio/wiki/OpenStudio-SDK-Version-Compatibility-Matrix

Other items

None.

New action items

None.

Previous action items

Focus on finishing pending PRs.

Clone this wiki locally