feat(rlsapi): implement LLM integration for v1 /infer endpoint #916
Red Hat Konflux kflux-prd-rh02 / Konflux kflux-prd-rh02 / lightspeed-stack-on-pull-request
failed
Dec 15, 2025 in 2h 4m 34s
Failed
Konflux kflux-prd-rh02/lightspeed-stack-on-pull-request has failed.
Details
- Namespace: lightspeed-core-tenant
- PipelineRun: lightspeed-stack-on-pull-request-865kg
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🟢 Succeeded | 8 seconds | |
| 🟢 Succeeded | 13 seconds | |
| 🟢 Succeeded | 20 minutes | |
| 🔴 Failed | 11 minutes | |
| 🔴 Failed | 6 minutes |
Failure snippet:
task build-images has the status "Failed":subprocess exited with status 1
subprocess exited with status 1
Error: building at STEP "RUN . /cachi2/cachi2.env && if [ -f /cachi2/cachi2.env ]; then . /cachi2/cachi2.env && uv venv --seed --no-index --find-links ${PIP_FIND_LINKS} && . .venv/bin/activate && pip install --no-index --find-links ${PIP_FIND_LINKS} -r requirements.$(uname -m).txt -r requirements.torch.txt; else uv sync --locked --no-dev --group llslibdev; fi": exit status 1
Loading