Skip to content

Pull requests: metal3-io/project-infra

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Use server 04 instead of 05 in BML test approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#962 opened Feb 5, 2025 by kashifest Loading…
Enables optionally multiplatform container builds do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#960 opened Feb 3, 2025 by e-minguez Loading…
Update k8s-prow images, test-infra images as needed approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#959 opened Feb 1, 2025 by metal3-io-bot Loading…
🌱 Add new reusable release note generator size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#944 opened Jan 9, 2025 by mquhuy Loading…
Temporary assignment for CONTAINER_HUB_PROXY approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#911 opened Nov 22, 2024 by elfosardo Loading…
debug bml server 6 issue do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#859 opened Sep 18, 2024 by Sunnatillo Draft
WIP: work for prow monitoring do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#841 opened Aug 23, 2024 by NymanRobin Loading…
4 tasks
ProTip! Adding no:label will show everything without a label.