Run main Ruby tests with MMTk enabled in CI #360
yjit-ubuntu.yml
on: pull_request
Matrix: make
cargo test
43s
cargo clippy
29s
YJIT Ubuntu result
0s
Annotations
7 errors
make (check, --enable-yjit=dev)
Canceling since a higher priority waiting request for 'YJIT Ubuntu / 78/merge' exists
|
make (check, --enable-yjit=dev)
The operation was canceled.
|
make (test-bundled-gems, --enable-yjit=dev)
Canceling since a higher priority waiting request for 'YJIT Ubuntu / 78/merge' exists
|
make (test-bundled-gems, --enable-yjit=dev)
The operation was canceled.
|
make (check, --enable-yjit=dev, --yjit-call-threshold=1 --yjit-verify-ctx --yjit-code-gc, -T --yj...
Canceling since a higher priority waiting request for 'YJIT Ubuntu / 78/merge' exists
|
make (check, --enable-yjit=dev, --yjit-call-threshold=1 --yjit-verify-ctx --yjit-code-gc, -T --yj...
The operation was canceled.
|
YJIT Ubuntu result
Process completed with exit code 1.
|