chore(Dependencies) : update mongo-scala-bson from 4.4.2 to 4.11.1 #2533
scala.yml
on: pull_request
Matrix: Benchmarks
Matrix: Cdktf
Matrix: Dotty
Matrix: Integration Test
Matrix: Script Test
Matrix: Test
Annotations
7 errors
Integration Test (15.0.2)
Process completed with exit code 1.
|
Integration Test (11.0.17)
Process completed with exit code 1.
|
Integration Test (17.0.5)
The job was canceled because "_15_0_2" failed.
|
Integration Test (17.0.5)
The operation was canceled.
|
Test (11.0.17)
Process completed with exit code 1.
|
Test (15.0.2)
The job was canceled because "_11_0_17" failed.
|
Test (15.0.2)
The operation was canceled.
|