Skip to content

add six

add six #101

Triggered via push September 17, 2024 22:18
Status Failure
Total duration 36s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.8)
Process completed with exit code 1.
build (3.7)
The job was canceled because "_3_8" failed.
build (3.7)
The operation was canceled.
build (3.10)
The job was canceled because "_3_8" failed.
build (3.10)
The operation was canceled.
build (3.9)
The job was canceled because "_3_8" failed.
build (3.9)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_8" failed.
build (3.11)
The operation was canceled.