Skip to content

STOR-2857: Enable MutableCSINodeAllocatableCount tests for all clusters#30767

Open
Phaow wants to merge 1 commit intoopenshift:mainfrom
Phaow:remove-tp-check
Open

STOR-2857: Enable MutableCSINodeAllocatableCount tests for all clusters#30767
Phaow wants to merge 1 commit intoopenshift:mainfrom
Phaow:remove-tp-check

Conversation

@Phaow
Copy link
Contributor

@Phaow Phaow commented Feb 9, 2026

Signed-off-by: Penghao <pewang@redhat.com>
@openshift-ci-robot
Copy link

Pipeline controller notification
This repo is configured to use the pipeline controller. Second-stage tests will be triggered either automatically or after lgtm label is added, depending on the repository configuration. The pipeline controller will automatically detect which contexts are required and will utilize /test Prow commands to trigger the second stage.

For optional jobs, comment /test ? to see a list of all defined jobs. To trigger manually all jobs from second stage use /pipeline required command.

This repository is configured in: automatic mode

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Feb 9, 2026
@openshift-ci-robot
Copy link

openshift-ci-robot commented Feb 9, 2026

@Phaow: This pull request references STOR-2857 which is a valid jira issue.

Details

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@Phaow
Copy link
Contributor Author

Phaow commented Feb 9, 2026

/hold
This should be merged after #30766 which fixed a flakeness.

@openshift-ci openshift-ci bot requested review from dobsonj and gnufied February 9, 2026 01:52
@openshift-ci openshift-ci bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Feb 9, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 9, 2026

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: Phaow
Once this PR has been reviewed and has the lgtm label, please assign dobsonj for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@Phaow
Copy link
Contributor Author

Phaow commented Feb 9, 2026

/retest-required

@openshift-ci-robot
Copy link

Scheduling required tests:
/test e2e-aws-csi
/test e2e-aws-ovn-fips
/test e2e-aws-ovn-microshift
/test e2e-aws-ovn-microshift-serial
/test e2e-aws-ovn-serial-1of2
/test e2e-aws-ovn-serial-2of2
/test e2e-gcp-csi
/test e2e-gcp-ovn
/test e2e-gcp-ovn-upgrade
/test e2e-metal-ipi-ovn-ipv6
/test e2e-vsphere-ovn
/test e2e-vsphere-ovn-upi

@Phaow
Copy link
Contributor Author

Phaow commented Feb 10, 2026

/verified by CI

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Feb 10, 2026
@openshift-ci-robot
Copy link

@Phaow: This PR has been marked as verified by CI.

Details

In response to this:

/verified by CI

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@Phaow
Copy link
Contributor Author

Phaow commented Feb 11, 2026

/retest-required

@Phaow
Copy link
Contributor Author

Phaow commented Feb 11, 2026

/test e2e-metal-ipi-ovn-ipv6

@Phaow
Copy link
Contributor Author

Phaow commented Feb 12, 2026

/retest-required

@Phaow
Copy link
Contributor Author

Phaow commented Feb 12, 2026

/test e2e-metal-ipi-ovn-ipv6

@openshift-trt
Copy link

openshift-trt bot commented Feb 12, 2026

Job Failure Risk Analysis for sha: 4d8b88c

Job Name Failure Risk
pull-ci-openshift-origin-main-e2e-metal-ipi-ovn-ipv6 Low
[Monitor:legacy-test-framework-invariants-pathological][sig-arch] events should not repeat pathologically
This test has passed 50.00% of 2 runs on release 4.22 [Architecture:amd64 FeatureSet:default Installer:ipi JobTier:standard Network:ovn NetworkStack:ipv6 Owner:eng Platform:metal Procedure:none SecurityMode:default Topology:ha Upgrade:none] in the last week.

Open Bugs
Metal ipv6 payload failures
MAPO creates events when reconciling machines

@Phaow
Copy link
Contributor Author

Phaow commented Feb 12, 2026

/retest-required

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 13, 2026

@Phaow: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@Phaow
Copy link
Contributor Author

Phaow commented Feb 13, 2026

Hi @jsafrane , could you help take a look when you get a chance? Thank you!^^

@Phaow
Copy link
Contributor Author

Phaow commented Feb 13, 2026

/assign @jsafrane

@Phaow
Copy link
Contributor Author

Phaow commented Feb 13, 2026

/hold cancel

@openshift-ci openshift-ci bot removed the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Feb 13, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants