@rwadhwa910

If a user selects a wrong schedule type while making the schedule there is no option of changing it again, One will have to delete the schedule and make the new schedule again, having this feature can make the user change the type of schedule, also the default value of the schedule type is Dimensionless which is not used in most of the application and that too is 3 times along with fractional in between them.Making fractional as default can help as fractional is used a lot of times while making different schedules.

Also there are multiple instance where the same schedule type is used , For Example Temperature is used more than two times, although the minimum and maximum temperatures are different for both of them, specifying these can help the user while making the initial selection.

sc1

SC2

sc3

Metadata

Metadata

Assignees

No one assigned

    Labels

    Enhancement RequestNew feature or requestTriageIssue needs to be assessed and labeled, further information on reported might be needed

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions