Skip to content

ismp parachain benchmark #1858

ismp parachain benchmark

ismp parachain benchmark #1858

Triggered via pull request December 25, 2024 14:07
@dharjeezydharjeezy
synchronize #354
Status Cancelled
Total duration 1m 54s
Artifacts

ci.yml

on: pull_request_target
Check Workspace
6s
Check Workspace
Unit Tests
8s
Unit Tests
Integration Tests
9s
Integration Tests
Check ismp-solidity
48s
Check ismp-solidity
Hyperclient Integration Tests
1m 44s
Hyperclient Integration Tests
Matrix: Check Wasm Crates
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 5 warnings
Check Wasm Crates (gargantua-runtime)
Process completed with exit code 1.
Check Wasm Crates (nexus-runtime)
The job was canceled because "gargantua-runtime" failed.
Check Workspace
Process completed with exit code 1.
Integration Tests
Process completed with exit code 1.
Unit Tests
Process completed with exit code 1.
Hyperclient Integration Tests
Canceling since a higher priority waiting request for 'ci-dami/ismp-parachain-benchmark' exists
Hyperclient Integration Tests
The operation was canceled.
Check Wasm Crates (gargantua-runtime)
This job failure may be caused by using an out of date self-hosted runner. You are currently using runner version 2.320.0. Please update to the latest version 2.321.0
Check Workspace
This job failure may be caused by using an out of date self-hosted runner. You are currently using runner version 2.320.0. Please update to the latest version 2.321.0
Integration Tests
This job failure may be caused by using an out of date self-hosted runner. You are currently using runner version 2.320.0. Please update to the latest version 2.321.0
Check ismp-solidity
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Unit Tests
This job failure may be caused by using an out of date self-hosted runner. You are currently using runner version 2.320.0. Please update to the latest version 2.321.0