Skip to content

Allow to link utils package during Main build of Camel tooling projects #281

Allow to link utils package during Main build of Camel tooling projects

Allow to link utils package during Main build of Camel tooling projects #281

Re-run triggered February 15, 2024 09:47
Status Cancelled
Total duration 8m 56s
Artifacts 3

main.yaml

on: push
utils fork check
2s
utils fork check
Matrix: main
Status Check
0s
Status Check
Fit to window
Zoom out
Zoom in

Annotations

3 errors
main (macos-13, 1.82.3, stable)
The run was canceled by @pospisilf.
main (macos-13, 1.82.3, stable)
The operation was canceled.
Status Check
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
macos-13-1.82.3-ui-test-logs Expired
6.49 KB
macos-13-1.82.3-ui-test-screenshots Expired
127 KB
sbom Expired
78.2 KB