Skip to content

Allow to link utils package during Main build of Camel tooling projects #297

Allow to link utils package during Main build of Camel tooling projects

Allow to link utils package during Main build of Camel tooling projects #297

Triggered via push February 15, 2024 13:28
Status Failure
Total duration 5m 41s
Artifacts 2

main.yaml

on: push
Utils fork check
2s
Utils fork check
Matrix: main
Status Check
0s
Status Check
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 6 warnings
main (macos-13, max, stable)
Process completed with exit code 1.
main (macos-13, 1.82.3, stable)
Process completed with exit code 1.
main (ubuntu-latest, max, stable)
Process completed with exit code 1.
main (ubuntu-latest, 1.82.3, stable)
Process completed with exit code 1.
Status Check
Process completed with exit code 1.
main (macos-13, max, stable)
No files were found with the provided path: /tmp/log-camel-lsp.log /tmp/log-camel*.log.gz. No artifacts will be uploaded.
main (macos-13, max, stable)
No files were found with the provided path: .vscode-test/logs/*. No artifacts will be uploaded.
main (macos-13, 1.82.3, stable)
No files were found with the provided path: .vscode-test/logs/*. No artifacts will be uploaded.
main (macos-13, 1.82.3, stable)
No files were found with the provided path: /tmp/log-camel-lsp.log /tmp/log-camel*.log.gz. No artifacts will be uploaded.
main (ubuntu-latest, max, stable)
No files were found with the provided path: .vscode-test/logs/*. No artifacts will be uploaded.
main (ubuntu-latest, 1.82.3, stable)
No files were found with the provided path: .vscode-test/logs/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
ubuntu-latest-1.82.3-camel-lsp-log Expired
5.04 KB
ubuntu-latest-max-camel-lsp-log Expired
5.7 KB