Skip to content

changelog 📝; 6.1.1 #311

changelog 📝; 6.1.1

changelog 📝; 6.1.1 #311

Triggered via push September 3, 2023 15:15
Status Failure
Total duration 53s
Artifacts

test.yml

on: push
Matrix: integration-tests
Matrix: unit-tests
Matrix: e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-tests (16.x)
Process completed with exit code 1.
integration-tests (20.x)
The job was canceled because "_16_x" failed.
integration-tests (20.x)
Process completed with exit code 1.
integration-tests (18.x)
The job was canceled because "_16_x" failed.
integration-tests (18.x)
The operation was canceled.