Continuous Integration #637
ci.yaml
on: schedule
Matrix: Integration test suite
Matrix: Linting and tests
Annotations
10 errors and 2 warnings
Linting and tests (17)
Process completed with exit code 127.
|
Linting and tests (11)
The job was canceled because "_17" failed.
|
Linting and tests (11)
Process completed with exit code 127.
|
Linting and tests (8)
The job was canceled because "_17" failed.
|
Linting and tests (8)
The operation was canceled.
|
Integration test suite (17)
Process completed with exit code 1.
|
Integration test suite (8)
The job was canceled because "_17" failed.
|
Integration test suite (8)
Process completed with exit code 1.
|
Integration test suite (11)
The job was canceled because "_17" failed.
|
Integration test suite (11)
The operation was canceled.
|
Linting and tests (17)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Integration test suite (17)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|