Skip to content

chore: bump golang.org/x/crypto from 0.23.0 to 0.31.0 #205

chore: bump golang.org/x/crypto from 0.23.0 to 0.31.0

chore: bump golang.org/x/crypto from 0.23.0 to 0.31.0 #205

Triggered via pull request December 12, 2024 00:04
Status Failure
Total duration 2m 20s
Artifacts

pr_test-matrix.yml

on: pull_request
Matrix: linux-matrix
Matrix: windows-matrix
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 1 warning
linux-matrix (1.23, ubuntu-latest)
Process completed with exit code 1.
linux-matrix (1.22, ubuntu-latest)
The job was canceled because "_1_23_ubuntu-latest" failed.
linux-matrix (1.22, ubuntu-latest)
The operation was canceled.
windows-matrix (1.22, windows-latest)
Process completed with exit code 1.
windows-matrix (1.23, windows-latest)
The job was canceled because "_1_22_windows-latest" failed.
windows-matrix (1.23, windows-latest)
The operation was canceled.
linux-matrix (1.23, ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636