chore: release v8.12.4 #5111
Merged
chore: release v8.12.4 #5111
Salesforce Nucleus / continuous-integration/nucleus/test
completed
Jan 8, 2025 in 21m 55s
Downstream build step failed (ignored)
A downstream build step failed. This may due to a breaking change being introduced. Please see the logs for details.
Result was ignored for reason: Auto-ignored because the failed downstream projects depend on a different major version of lwc
https://nucleus.uipengsys-public.buildndeliver-s.aws-esvc1-useast2.aws.sfdc.cl/workflows/257836
Loading