Skip to content

Update dependency ruff to v0.8.6 #472

Update dependency ruff to v0.8.6

Update dependency ruff to v0.8.6 #472

Triggered via pull request September 5, 2024 20:09
Status Failure
Total duration 31s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.12)
Process completed with exit code 2.
build (3.9)
The job was canceled because "_3_12" failed.
build (3.8)
The job was canceled because "_3_12" failed.
build (3.8)
The operation was canceled.
build (3.11)
The job was canceled because "_3_12" failed.
build (3.10)
The job was canceled because "_3_12" failed.
build (3.10)
The operation was canceled.