Skip to content

Update dependency ruff to v0.7.4 #519

Update dependency ruff to v0.7.4

Update dependency ruff to v0.7.4 #519

Triggered via push November 15, 2024 13:21
Status Failure
Total duration 30s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (3.12)
Process completed with exit code 2.
build (3.11)
The job was canceled because "_3_12" failed.
build (3.9)
The job was canceled because "_3_12" failed.
build (3.9)
The operation was canceled.
build (3.10)
The job was canceled because "_3_12" failed.
build (3.10)
The operation was canceled.
build (3.8)
The job was canceled because "_3_12" failed.
build (3.8)
The operation was canceled.