chore(deps): update dependency xo to v0.39.1 #325
test.yml
on: push
Matrix: test_matrix
test_dev
25s
test
0s
Annotations
8 errors
test_matrix (20.6.1)
Process completed with exit code 1.
|
test_matrix (18.17)
Process completed with exit code 1.
|
test_matrix (20)
The job was canceled because "_20_6_1" failed.
|
test_matrix (20)
Process completed with exit code 1.
|
test_matrix (21)
The job was canceled because "_20_6_1" failed.
|
test_matrix (21)
The operation was canceled.
|
test_dev
Process completed with exit code 1.
|
test
Process completed with exit code 1.
|