Skip to content

chore(deps): lock file maintenance #345

chore(deps): lock file maintenance

chore(deps): lock file maintenance #345

Triggered via push December 16, 2024 22:19
Status Failure
Total duration 27s
Artifacts

test.yml

on: push
Matrix: test_matrix
test_dev
4s
test_dev
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 3 warnings
test_matrix (20)
Process completed with exit code 1.
test_dev
Process completed with exit code 1.
test_matrix (21)
The job was canceled because "_20" failed.
test_matrix (21)
The operation was canceled.
test_matrix (18.17)
The job was canceled because "_20" failed.
test_matrix (18.17)
The operation was canceled.
test_matrix (20.6.1)
The job was canceled because "_20" failed.
test_matrix (20.6.1)
The operation was canceled.
test
Process completed with exit code 1.
test_matrix (20)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test_dev
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636