fix(deps): update dependency eslint-config-next to v15 #2854
ci.yml
on: pull_request
Detect changes
4s
Matrix: station_ci
ui-docs (preview)
/
ci
2m 23s
Cloud Primary infrastructure (preview)
/
infra-build-and-execute
DoProcess infrastructure (preview)
/
infra-build-and-execute
WorkingParty infrastructure (preview)
/
infra-build-and-execute
uier infrastructure (preview)
/
infra-build-and-execute
[CI] OK
0s
Annotations
3 errors and 4 warnings
App (analysis) / ci
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 5 minutes.
|
App (analysis) / ci
The operation was canceled.
|
doprocess (analysis) / ci
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 5 minutes.
|
WorkingParty (preview) / ci
Failed to download action 'https://api.github.com/repos/pnpm/action-setup/tarball/a3252b78c470c02df07e9d59298aecedc3ccdd6d'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
WorkingParty (preview) / ci
Back off 19.393 seconds before retry.
|
WorkingParty (preview) / ci
Failed to download action 'https://api.github.com/repos/pnpm/action-setup/tarball/a3252b78c470c02df07e9d59298aecedc3ccdd6d'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
WorkingParty (preview) / ci
Back off 18.562 seconds before retry.
|