Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

refactor(test): fix scope of init method while upgrading junit to 5.9.0 #1102

Merged
merged 1 commit into from
Jul 17, 2024

refactor(test): fix scope of init method while upgrading junit to 5.9.0

531cabc
Select commit
Loading
Failed to load commit list.
Merged

refactor(test): fix scope of init method while upgrading junit to 5.9.0 #1102

refactor(test): fix scope of init method while upgrading junit to 5.9.0
531cabc
Select commit
Loading
Failed to load commit list.
Mergify / Queue: Embarked in merge queue succeeded Jul 17, 2024 in 0s

The pull request embarked with master (cb64b94) will be merged soon

Required conditions for merge:

  • status-success=build
  • all of [📃 From pull request rule Automatically merge on CI success and review]:
    • -draft [📌 queue requirement]
    • approved-reviews-by=@oss-approvers
    • base=master
    • label=ready to merge
    • status-success=build
    • any of [📌 queue -> configuration change requirements]:
      • -mergify-configuration-changed
      • check-success=Configuration changed
    • any of [🔀 queue conditions]:
      • all of [📌 queue conditions of queue default]:
        • any of [🛡 GitHub branch protection]:
          • check-success=build
          • check-neutral=build
          • check-skipped=build
  • any of [🛡 GitHub branch protection]:
    • check-success=build
    • check-neutral=build
    • check-skipped=build

Check-runs and statuses of the embarked pull request #1102:

build details