Skip to content

Fix adata copy (coarse transition matrix) (#1223) #790

Fix adata copy (coarse transition matrix) (#1223)

Fix adata copy (coarse transition matrix) (#1223) #790

Triggered via push September 15, 2024 17:20
Status Failure
Total duration 6h 0m 25s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 3.10, slepc)
Process completed with exit code 1.
test (ubuntu-latest, 3.10, noslepc)
The job running on runner GitHub Actions 32 has exceeded the maximum execution time of 360 minutes.
test (ubuntu-latest, 3.10, noslepc)
The operation was canceled.
test (ubuntu-latest, 3.9, noslepc)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 360 minutes.
test (ubuntu-latest, 3.9, noslepc)
The operation was canceled.
test (ubuntu-latest, 3.11, noslepc)
The job running on runner GitHub Actions 7 has exceeded the maximum execution time of 360 minutes.
test (ubuntu-latest, 3.11, noslepc)
The operation was canceled.
test (ubuntu-latest, 3.12, noslepc)
The job running on runner GitHub Actions 57 has exceeded the maximum execution time of 360 minutes.
test (ubuntu-latest, 3.12, noslepc)
The operation was canceled.
test (macos-14, 3.10, noslepc)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 360 minutes.
test (macos-14, 3.10, noslepc)
The operation was canceled.