CI: set elements and bitcoind versions in one place. #547
ci.yaml
on: push
Pre-build checks
10m 11s
Matrix: compile
Run fuzz regression tests
9m 13s
Matrix: Run unit tests
Matrix: Sanitizers Test CLN
Matrix: integration-valgrind
Matrix: integration
CI completion
0s
Annotations
11 errors
Valgrind Test CLN Valgrind (06/10)
Process completed with exit code 1.
|
Valgrind Test CLN Valgrind (10/10)
The job was canceled because "Valgrind__06_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (10/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (02/10)
The job was canceled because "Valgrind__06_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (02/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (07/10)
The job was canceled because "Valgrind__06_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (07/10)
The operation was canceled.
|
Valgrind Test CLN Valgrind (09/10)
The job was canceled because "Valgrind__06_10__--test-g" failed.
|
Valgrind Test CLN Valgrind (09/10)
The operation was canceled.
|
Test CLN liquid
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 120 minutes.
|
Test CLN liquid
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cln-compile-clang-sanitizers.tar.bz2
Expired
|
172 MB |
|
cln-compile-clang.tar.bz2
Expired
|
118 MB |
|
cln-compile-gcc-O3.tar.bz2
Expired
|
146 MB |
|
cln-compile-gcc.tar.bz2
Expired
|
117 MB |
|