Skip to content

NODE-5787 Sync with upstream controller v1.11.3 #1260

NODE-5787 Sync with upstream controller v1.11.3

NODE-5787 Sync with upstream controller v1.11.3 #1260

Re-run triggered November 20, 2024 19:15
Status Failure
Total duration 14s
Artifacts 2

ci.yaml

on: pull_request
Changes
5s
Changes
Matrix: Build images
Matrix: Chart testing
Matrix: Smoke
Matrix: E2E - Wallarm
Fit to window
Zoom out
Zoom in

Annotations

7 errors
E2E
Process completed with exit code 2.
E2E - Wallarm (v1.26.15)
Process completed with exit code 2.
Smoke (v1.26.15, amd64)
Process completed with exit code 2.
E2E - Wallarm (v1.29.4)
The job was canceled because "v1_26_15" failed.
E2E - Wallarm (v1.28.9)
The job was canceled because "v1_26_15" failed.
E2E - Wallarm (v1.30.0)
The job was canceled because "v1_26_15" failed.
E2E - Wallarm (v1.27.13)
The job was canceled because "v1_26_15" failed.