Skip to content

NODE-5787 Sync with upstream controller v1.11.3 #1261

NODE-5787 Sync with upstream controller v1.11.3

NODE-5787 Sync with upstream controller v1.11.3 #1261

Triggered via pull request November 21, 2024 10:53
@nedvnanedvna
synchronize #489
NODE-5787
Status Cancelled
Total duration 30m 13s
Artifacts 2

ci.yaml

on: pull_request
Changes
5s
Changes
Matrix: Build images
Matrix: Chart testing
Matrix: Smoke
Matrix: E2E - Wallarm
Fit to window
Zoom out
Zoom in

Annotations

15 errors
E2E - Wallarm (v1.27.13)
Process completed with exit code 2.
E2E - Wallarm (v1.30.0)
The job was canceled because "v1_27_13" failed.
E2E - Wallarm (v1.30.0)
The operation was canceled.
E2E - Wallarm (v1.28.9)
The job was canceled because "v1_27_13" failed.
E2E - Wallarm (v1.28.9)
The operation was canceled.
E2E - Wallarm (v1.29.4)
The job was canceled because "v1_27_13" failed.
E2E - Wallarm (v1.29.4)
The operation was canceled.
E2E - Wallarm (v1.26.15)
The job was canceled because "v1_27_13" failed.
E2E - Wallarm (v1.26.15)
The operation was canceled.
Smoke (v1.26.15, amd64)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Smoke (v1.26.15, amd64)
The operation was canceled.
Chart testing (install)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
Chart testing (install)
The operation was canceled.
E2E
The run was canceled by @nedvna.
E2E
The operation was canceled.

Artifacts

Produced during runtime
Name Size
controller-amd64.tar Expired
276 MB
controller-arm64.tar Expired
267 MB