Skip to content

Preparing 5.0.0

Preparing 5.0.0 #886

Triggered via pull request July 10, 2024 16:09
@SpomkySpomky
synchronize #557
deps/upgrade
Status Failure
Total duration 1m 27s
Artifacts

integrate.yml

on: pull_request
0️⃣ Byte-level
2s
0️⃣ Byte-level
1️⃣ Syntax errors
20s
1️⃣ Syntax errors
3️⃣ Static Analysis
50s
3️⃣ Static Analysis
4️⃣ Coding Standards
38s
4️⃣ Coding Standards
6️⃣ Rector Checkstyle
33s
6️⃣ Rector Checkstyle
7️⃣ Exported files
4s
7️⃣ Exported files
Matrix: 2️⃣ JS tests
Matrix: 2️⃣ Unit and functional tests
Fit to window
Zoom out
Zoom in

Annotations

3 errors
2️⃣ Unit and functional tests (ubuntu-latest, 8.3, lowest)
Process completed with exit code 2.
2️⃣ Unit and functional tests (ubuntu-latest, 8.3, highest)
The job was canceled because "ubuntu-latest_8_3_lowest" failed.
2️⃣ Unit and functional tests (ubuntu-latest, 8.3, highest)
The operation was canceled.