Skip to content

Merge TSAN test matrices in CI (#123278) #7

Merge TSAN test matrices in CI (#123278)

Merge TSAN test matrices in CI (#123278) #7

Triggered via push February 5, 2025 02:56
Status Failure
Total duration 1h 38m 17s
Artifacts

jit.yml

on: push
Interpreter (Debug)
7m 43s
Interpreter (Debug)
Free-Threaded (Debug)
13m 20s
Free-Threaded (Debug)
Matrix: jit
Fit to window
Zoom out
Zoom in

Annotations

7 errors
aarch64-unknown-linux-gnu/clang (Release)
Process completed with exit code 2.
aarch64-unknown-linux-gnu/gcc (Release)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 90 minutes.
aarch64-unknown-linux-gnu/gcc (Release)
The operation was canceled.
aarch64-unknown-linux-gnu/gcc (Debug)
The job running on runner GitHub Actions 19 has exceeded the maximum execution time of 90 minutes.
aarch64-unknown-linux-gnu/gcc (Debug)
The operation was canceled.
aarch64-unknown-linux-gnu/clang (Debug)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 90 minutes.
aarch64-unknown-linux-gnu/clang (Debug)
The operation was canceled.