Skip to content

Unify all the tox jobs into the top-level #334

Unify all the tox jobs into the top-level

Unify all the tox jobs into the top-level #334

Triggered via pull request March 26, 2024 13:08
Status Failure
Total duration 32m 2s
Artifacts 2

integration_test.yaml

on: pull_request
extra-args
0s
extra-args
Matrix: build-all-charms
integration-tests  /  ...  /  Get runner image
2s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
7s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
5s
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
31s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

2 errors
integration-tests / Integration tests / Integration tests
Canceling since there was an unexpected error with the concurrency group 'operator-workflows-Integration tests-integration-tests-refs/pull/50/merge-integration'.
Integration tests
GitHub Actions has encountered an internal error when running your job.

Artifacts

Produced during runtime
Name Size
k8s-charm Expired
3.42 MB
k8s-worker-charm Expired
6.32 MB