It reflects it exactly. thanks. |
I don't think it does. I don't think it's "right" or "perfect" at all. |
When we sat down when you started drawing it, this is exactly what we discussed. I'm going to ask for a budget with this option and also with multiple panes across the front. |
The shape is exactly what we had discussed. As I mentioned [https://github.com//issues/15#issuecomment-426301666], what we discussed with Sr. António was that he would give us a budget for various window pane configurations:
The panes will have to match the windows in the rest of the house so I don't think there are any blockers to sending this for a quote. We should then discuss our preferred option and confirm once we have the quotes. Are there any other configurations you'd like me to ask about? |
@iteles what |
Emailed earlier today. Now we wait. |
@iteles do you think Carlos could get a "head start" on this? |
Second option. Until the windows and doors are made, he won't start opening walls. |
@iteles I never suggested "opening walls". |
As he's gone to another obra, he will only begin working on things when we have a solid date for the windows to arrive unfortunately 😕 |
@iteles can we get Carlos to "assign" a "day labourer" to our project to do "prep" tasks |
I asked him that and he said he doesn't have enough people for the work he has on at the other sites at the moment, but to get in touch once things move forward with Sr. Antonio (who Pedro is seeing this afternoon and calling me when he's in his company). |
Ok. fair enough. construction crew are "scarce" right now. (we know from Andy's project) |
@iteles any news on the revised spec and cost for the veranda? |
Still waiting. My last chase was Thursday 15th November. |
The frames for the windows arrived on 19-Dec-2018 but there was no glass in them because of a factory delay 🤦♀️ The glass should arrive on 4-Jan-2019 or 7-Jan-2019. In the meantime, as we started to prepare the wall to be knocked out (by clearing the plaster first), we found this: These stones are massive and easily 30-40cm in depth, much bigger than the other stone wall that has been opened up. They are much bigger than expected, will need cranes to lift them (or will all need to be sliced into smaller pieces - in itself a big job) and if one is dropped from any height, it will crash straight through the floor into the level below. Our contractor has also told us that at the level of the quote he gave us for the work, he will lose money, which is not a situation we want to put him in either. It's a beautiful feature wall and I'm tempted to just leave it in place! I have two major concerns with this:
Next Steps
@nelsonic Could you please share the sketchup file so I can start trying some combinations please? |
"let's book a meeting during our meeting tomorrow" ... 🙄 |
Fair. But it's past 21h00 so it's not going to happen today and the first time we interact is our standup! |
@iteles I can make very workable built-in folding tables on both ends of the veranda that will maximise the space. The original idea to break down the veranda walls to expand the dining room was yours, you should have the "final say" on whether the idea should be "scrapped" to make the foreman happy (because it's going to be a lot of work to take down the massive stones). Please make the call. |
@iteles I printed the 2D renders. |
I love this wall and having a piece of the original wall on display in We had a meeting with our builders this week and agreed we would knock down the left-most wall and not the right-most wall. The right-most wall will be cleaned up and conserved and we'll make a sunny breakfast nook behind it ☀️ 🥐 🍓 Bringing the priority of this down now that construction has started and decisions required have been made. |
@iteles should I update the Sketchup Diagram? |
@nelsonic Yes, that's definitely the next step once they remake and fit the final window which they mis-measured (to keep the rain out)! 👍 |
@nelsonic I believe there are three things left to be done here:
|
We need to take/upload updated photos next time we are at the site. |
@nelsonic What is the best protective coat for the outside of these walls? This is definitely something Carlos could work on next week. |
@iteles good question. ❓ |
Currently they're just 'dry cement colour', in the wet it will look dark grey. I wasn't speaking so much of the colour as asking the question of if there's something that needs to go over the cement to protect it a bit more from the elements. |
@iteles maybe get some photos tomorrow to illustrate. |
I agree that the raw concrete/rendering should be protected from the elements (moss) ASAP. |
@iteles iSent these to you via email so you can just forward them to the relevant people if you feel they reflect your idea for the veranda. If not, please sit with me so we can re-do them. thanks.