Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Sprint 220 #21438

Closed
52 of 64 tasks
ibuziuk opened this issue Jun 2, 2022 · 2 comments
Closed
52 of 64 tasks

Sprint 220 #21438

ibuziuk opened this issue Jun 2, 2022 · 2 comments
Labels
kind/planning A checklist of issues for planning a particular sprint. sprint/current

Comments

@ibuziuk
Copy link
Member

ibuziuk commented Jun 2, 2022

This issue collects work items of the Eclipse Che Team for Sprint 220 (June 8 - June 28).
📓 Please note that this is a tentative plan until sprint planning has been conducted (June 8th)

The previous sprint #21395

Sprint goals

  • Red Hat OpenShift Dev Spaces 3.0 release
  • Migrate CodeReady Workspace 2.15.4 to Red Hat OpenShift DevSpaces of the Developer Sandbox staging cluster
  • Make che-code production ready (long-running goal for a couple of sprints)
  • Eclipse Che CR v2 (implementation + docs updates)

Sprint tasks

Blockers / Criticals for 3.0

Web Terminal

  • Update internal productization docs

DWO

Dashboard

Gateway

Git 0 Config

Automation

Machine exec

Docs

Operator

chectl

Technical debt

Developer Sandbox

Image Puller

Editors

Plugins

Productization items:

P1: 3.0 (postponed from previous sprint due to blockers)

  • Prepare 3.0 GA build for QE & track in spreadsheet
  • 89695 - Load images into errata & push to stage
  • SPMM-9036 create dsc/sources/manifests for cobrien to push to prod
  • CRW-2837 verify new developers.redhat.com page is live after push to prod

P1: 3.1 (postponed from previous sprint due to delay of 3.0)

  • CRW-2725 Re-enable replaces directive in operator-bundle sync*.sh and csv files
  • CRW-2665 Rename CodeReady Workspaces to Red Hat OpenShift Dev Spaces (RHOSDS)
    • CRW-2817 rename/move crw-samples projects to devspaces-samples org; update devfile references
    • CRW-2822 refactor CRW_ prefix in openshift templates and operator code to use DS_ prefix
    • CRW-2839 Create CI folder for new devspaces jobs, separate from CRW_CI folder
    • CRW-2810 Link to new (or renamed existing) product page content in Comet
    • CRW-2804 Request removal of tech preview operator-bundle codeready-workspaces2 from OCP 4.9-4.10 indexes, once CRW 3.0 is live
    • CRW-2837 Create new marketing & download pages for Dev Spaces

P2

  • CRW-2619 build python lang server from source / install via cachito - in progress from prev sprint - Mykhailo
  • CRW-2958 sync problems between ds-theia (upstream) and ds-images/ds-theia (midstream) - in progress from prev sprint - Mykhailo

Epics

  • CRW-2459 Improve codeready-workspaces-images local build story for better ease of use (and to allow GHA builds)
  • CRW-2444 Use Cachito for container sources (where possible)
  • CRW-1102 Provide Dev Spaces scratch builds for PR checks
@ibuziuk ibuziuk added kind/planning A checklist of issues for planning a particular sprint. sprint/next labels Jun 2, 2022
@che-bot che-bot added the status/need-triage An issue that needs to be prioritized by the curator responsible for the triage. See https://github. label Jun 2, 2022
@ibuziuk ibuziuk added status/analyzing An issue has been proposed and it is currently being analyzed for effort and implementation approach and removed status/need-triage An issue that needs to be prioritized by the curator responsible for the triage. See https://github. labels Jun 3, 2022
@nickboldt
Copy link
Contributor

nickboldt commented Jun 7, 2022

Productization items:

P1: 3.0 (postponed from previous sprint due to blockers)

  • Prepare 3.0 GA build for QE & track in spreadsheet
  • 89695 - Load images into errata & push to stage
  • SPMM-9036 create dsc/sources/manifests for cobrien to push to prod
  • CRW-2837 verify new developers.redhat.com page is live after push to prod

P1: 3.1 (postponed from previous sprint due to delay of 3.0)

  • CRW-2665 Rename CodeReady Workspaces to Red Hat OpenShift Dev Spaces (RHOSDS)
    • CRW-2817 rename/move crw-samples projects to devspaces-samples org; update devfile references
    • CRW-2822 refactor CRW_ prefix in openshift templates and operator code to use DS_ prefix
    • CRW-2839 Create CI folder for new devspaces jobs, separate from CRW_CI folder
    • CRW-2810 Link to new (or renamed existing) product page content in Comet
    • CRW-2804 Request removal of tech preview operator-bundle codeready-workspaces2 from OCP 4.9-4.10 indexes, once CRW 3.0 is live
    • CRW-2837 Create new marketing & download pages for Dev Spaces

P2

  • CRW-2619 build python lang server from source / install via cachito - in progress from prev sprint - Mykhailo
  • CRW-2958 sync problems between ds-theia (upstream) and ds-images/ds-theia (midstream) - in progress from prev sprint - Mykhailo

Epics

  • CRW-2459 Improve codeready-workspaces-images local build story for better ease of use (and to allow GHA builds)
  • CRW-2444 Use Cachito for container sources (where possible)
  • CRW-1102 Provide Dev Spaces scratch builds for PR checks

@ibuziuk ibuziuk added sprint/current and removed status/analyzing An issue has been proposed and it is currently being analyzed for effort and implementation approach sprint/next labels Jun 15, 2022
@ibuziuk ibuziuk mentioned this issue Jun 27, 2022
68 tasks
@ibuziuk ibuziuk closed this as completed Jun 28, 2022
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
kind/planning A checklist of issues for planning a particular sprint. sprint/current
Projects
None yet
Development

No branches or pull requests

4 participants