-
Notifications
You must be signed in to change notification settings - Fork 188
Pull requests: openshift-metal3/dev-scripts
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
TRT-1822: Make registry available from squid proxy as well
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#1702
opened Sep 17, 2024 by
stbenjam
Loading…
Fix mirror config for v6-primary
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
Fix issue with OVMF_CODE.fd symlink
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#1698
opened Aug 29, 2024 by
cybertron
Loading…
OCPBUGS-36506: Fix no route to host error
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#1677
opened Jul 15, 2024 by
MahnoorAsghar
Loading…
Ntsh: testing
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1673
opened Jul 9, 2024 by
derekhiggins
•
Draft
AGENT-925: Block port 22624 when adding day 2 worker node
#1671
opened Jun 28, 2024 by
rwsu
Loading…
Fix yq -iy unsupported flag
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1670
opened Jun 27, 2024 by
maximsava12
Loading…
Install ansible inside a venv instead of globally
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
Allow overriding OPENSHIFT_RELEASE_TAG
lgtm
Indicates that a PR is ready to be merged.
#1656
opened Apr 30, 2024 by
dtantsur
Loading…
cleanup: use $OPENSHIFT_INSTALLER path
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#1647
opened Apr 2, 2024 by
honza
Loading…
Also need to enable virtproxyd for RHEL9 when installing libvirt (#1635)
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#1636
opened Feb 29, 2024 by
YanhuiMa
Loading…
network: fix generation of VIPs for single- and dual-stack setups
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
#1628
opened Jan 23, 2024 by
mkowalski
Loading…
Fix delete PATH_CONF_DNSMASQ
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#1626
opened Jan 17, 2024 by
rdiazcam
Loading…
Fix yq command to be compatible with yq v4
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#1621
opened Dec 19, 2023 by
mnietoji
Loading…
Stop running auxiliary containers with maximum priveleges
#1606
opened Nov 23, 2023 by
dtantsur
Loading…
setup_podman_mirror_registry: expire mirror cert in 10 years
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#1585
opened Sep 18, 2023 by
vrutkovs
Loading…
Fix Assisted Service cleanup script
lgtm
Indicates that a PR is ready to be merged.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1476
opened Nov 4, 2022 by
mkowalski
Loading…
Add TEST_SW_RAID option
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#1436
opened Aug 16, 2022 by
hs0210
Loading…
remote_nodes.sh: teardown playbook uses roles from vm-setup
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#1412
opened Jun 9, 2022 by
vrutkovs
Loading…
MetalLB: Remove MetalLB deployment scripts
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1390
opened May 8, 2022 by
sabinaaledort
Loading…
assisted-service: Add imageStorage to the service configuration
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#1365
opened Mar 16, 2022 by
mkowalski
Loading…
Refactor to enable local storage
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#1313
opened Nov 24, 2021 by
hardys
Loading…
Do not remove upstream DNS configuraton in cleanup
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#1280
opened Jul 24, 2021 by
mkowalski
Loading…
ProTip!
Filter pull requests by the default branch with base:master.